Jan 29, 2014

one week makeover: progress on my girls bathroom

a lot has happened in the last 2 days!

the mirrors were installed:


the crown molding went up in the room.

i bought some ikea ritva panels and added some fringe trim to the edges.

the extra long shower curtain is 12" longer than a regular shower curtain, and work well when using "regular" curtains as shower curtain panels.
(the curtains still need to be pressed!)

i picked out some mats for the artwork. since time and money are a constraint, i am using ikea ribba frames and getting new mats cut.

still to do:
*install the header.trim over the mirror.
*paint the new trim
*make the wood valance for over the tub...and install it!
*hang wallpaper
*install towel rings, toilet paper holder
*hang art

here is a better look at the wallpaper that i selected with the granite.

i hope it arrives in the mail today so that i can get it hung tomorrow!